Deep-Space Extraction Systems

Prospect

Autonomous extraction rigs. Near-Earth asteroids.
Orbital depots delivering before a single terrestrial
mine permit clears review.

MISSION PRX-7 · LIVE TELEMETRY

DIST FROM EARTH

1.847AU

EST YIELD MASS

4,210MT

MISSION ELAPSED

847D 14H 32M 11S

SCROLL
ACTIVE RIGS7
MISSIONS COMPLETED23
TOTAL YIELD DELIVERED18,420 MT
CURRENT ASTEROID TARGETS4
ORBITAL DEPOTS ONLINE3
CLIENTS UNDER CONTRACT14
PLATINUM PURITY ACHIEVED99.94%
COBALT PURITY ACHIEVED99.87%
MISSION SUCCESS RATE96.2%
NEXT DELIVERY WINDOW38 DAYS
ACTIVE RIGS7
MISSIONS COMPLETED23
TOTAL YIELD DELIVERED18,420 MT
CURRENT ASTEROID TARGETS4
ORBITAL DEPOTS ONLINE3
CLIENTS UNDER CONTRACT14
PLATINUM PURITY ACHIEVED99.94%
COBALT PURITY ACHIEVED99.87%
MISSION SUCCESS RATE96.2%
NEXT DELIVERY WINDOW38 DAYS
Asteroid surface illuminated by solar radiation, extraction rig visible at lower frame
EXTRACTION BAY — RESOURCE CATALOG & ORE-GRADE SPECIFICATIONS

EXTRACTION BAY — RESOURCE CATALOG

Ore-Grade
Specifications

CATALOG IDCAT-2026-Q1
LAST UPDATED26 FEB 2026
ACTIVE LISTINGS5
Deep space orbital view showing Earth and cargo trajectory arc
TRANSIT CORRIDOR — ASTEROID-TO-DEPOT-TO-EARTH LOGISTICS PIPELINE

TRANSIT CORRIDOR — LOGISTICS PIPELINE

Asteroid → Depot
→ Earth

STG-01

Asteroid Rendezvous

Near-Earth Object intercept and surface anchoring

TRANSIT TIME3–9 months
DELTA-V BUDGET2.4–6.1 km/s
TARGET CLASSNEA / C, M, S-type
STG-02

Extraction Operations

Drill array deployment, core sampling, bulk ore harvest

OPERATION WINDOW180–540 days
DAILY YIELD RATE2–12 MT/day
ENERGY SOURCE28 kW solar array
STG-03

Orbital Depot Transfer

Canister payload ejection, depot intercept and docking

DEPOT LOCATIONSL1, L2, LEO-3
TRANSFER DELTA-V0.8–2.2 km/s
CANISTER CAPACITY4.2 MT each
STG-04

Earth Delivery

Reentry capsule dispatch, atmospheric deceleration, recovery

REENTRY WINDOWQuarterly
DELIVERY LEAD TIME38–90 days
RECOVERY ZONESPacific / Indian Ocean

END-TO-END CYCLE

14–24months

ACTIVE DEPOTS

3orbital

DELIVERY WINDOWS

4per year

PAYLOAD CAPACITY

840MT/window

Orbital refinery module interior, centrifuge array in operation
REFINERY MODULE — PROCESSING METHODOLOGY & PURITY BENCHMARKS

REFINERY MODULE — PROCESSING & PURITY

Purity
Benchmarks

CENTRIFUGE ARRAYRUNNING
REFINERY TEMP1,847°C
BATCH IN PROCESSPRX-7-B14
PtREF-PGM

Platinum (Pt)

Method: Vacuum arc remelting + zone refining

NIST SRM 680e

PURITY99.94%

Exceeds ASTM B561 Grade 1

IrREF-IRD

Iridium (Ir)

Method: Carbonyl decomposition + electron beam refining

NIST SRM 685

PURITY99.91%

Exceeds ISO 9202:2014

CoREF-COB

Cobalt (Co)

Method: Hydrometallurgical solvent extraction

SGS Minerals

PURITY99.87%

Battery-grade (OECD 3TG compliant)

BiREF-BIS

Bismuth (Bi)

Method: Pyrometallurgical refining + electrolysis

Intertek

PURITY99.999%

Pharmaceutical grade USP

NdREF-NEO

Neodymium (Nd)

Method: Solvent extraction + electrodeposition

Bureau Veritas

PURITY99.5%

Magnet-grade MG-Nd

All refining operations are conducted in the orbital processing module aboard Depot L1-Alpha. Zero terrestrial handling prior to final assay certification. Certified samples available upon NDA execution. Third-party verification conducted by Bureau Veritas, SGS Minerals, and Intertek under ISO/IEC 17025 accreditation.

Spectral analysis scan of carbonaceous chondrite sample, element signatures visible
ELEMENT MANIFEST — ASTEROID-EXTRACTABLE PERIODIC TABLE

ELEMENT MANIFEST — UNGATED UTILITY

Asteroid-Extractable
Periodic Table

Highlighted elements have confirmed extraction viability across Prospect mission data. Select any element to view yield data and mission attribution.

High yield
Medium yield
Low yield

Select an extractable
element to view data

Mission control data wall showing orbital telemetry and supply forecasts
MANIFEST OFFICE — RESOURCE LIBRARY & MISSION ARCHIVES

MANIFEST OFFICE — RESOURCE LIBRARY

Access the
Resource Library

Extraction feasibility studies, orbital logistics white papers, spectral assay databases, and quarterly yield reports. One form. No sales call. Immediate access.

DOC-001·Feasibility Study

Near-Earth Asteroid Extraction Feasibility: M-Type Targets 2024–2028

Jan 202684pp
RESTRICTED — NDA REQUIRED
DOC-002·White Paper

Orbital Logistics Architecture: Depot Placement and Delivery Windows

Nov 202552pp
RESTRICTED — NDA REQUIRED
DOC-003·Assay Database

Spectral Assay Database: PRX-1 through PRX-7 Full Elemental Analysis

Feb 2026312pp
RESTRICTED — NDA REQUIRED
DOC-004·Quarterly Report

Q4 2025 Yield Report: Tonnage, Purity, and Delivery Reconciliation

Jan 202638pp
RESTRICTED — NDA REQUIRED
DOC-005·Supply Forecast

PGM Supply Forecast 2026–2032: Orbital vs. Terrestrial Sourcing Models

Dec 202567pp
RESTRICTED — NDA REQUIRED
DOC-006·Certification Report

Cobalt Conflict-Free Certification: Chain of Custody from Asteroid to Depot

Oct 202529pp
RESTRICTED — NDA REQUIRED

Provide your work email and organization. No password, no account creation. A one-time access link will be dispatched within 60 seconds.

Data handled under ISO/IEC 27001. No marketing. No re-sale. Prospect Extraction Systems Inc. privacy policy applies.